| Category |
Albums |
Files |
|
9 |
149 |

|
| 149 files in 9 albums and 1 categories with 0 comments viewed 6837 times |
| Random files |

Looking West39 viewsView from the driveway. New house is proposed to be 25 feet to the right (north) of the visible end of the existing house
9-08-07
|
|

North Side43 views1-25-08
|
|

The Back Side86 viewsThe home is looking complete now, just need stairs
3-06-08
|
|

Front side57 viewsThe front of the house looks more finished with the skirting installed
3-03-08
|
|

Guest Bath86 viewsThis view shows the pine door and trim work, knotty alder cabinetry, tile counter and bronze hardware.
2-25-08
|
|

Looking West31 viewsThis view shows where the driveway turn-a-round will re-connect back onto the driveway.
9-08-07
|
|

Raising the Conduit38 viewsThe PUD installs conduit and secondary lines
2-29-08
|
|

Washington State Legal47 viewsThis is what it takes to meet code in Washington state for manufactured housing.
The code writers are still in the 1960s as this electrical service is designed for a "mobile home". My home weighs over 90,000 pounds and is not mobile in any fashion.
2-19-08
|
|
| Last additions |

Finishing Touches28 viewsTightening up things for the long journey
9-27-08Apr 22, 2009
|
|

Section B29 viewsSection B is nearly road ready. No remote trax unit for this section.
9-27-08Apr 22, 2009
|
|

Calling all Cars30 viewsThe driver is calling for the pilot vehicles
9-27-08Apr 22, 2009
|
|

Home Site now Vacant34 viewsThe home site is now vacant!
9-27-08Apr 22, 2009
|
|

Last Section Leaves the Yard30 viewsSection B is waiting for the pilot vehicles
9-27-08Apr 22, 2009
|
|

Leaving the Yard35 viewsSection A leaves the yard and begins climbing the driveway
9-21-08Apr 22, 2009
|
|

One Section Remains36 viewsSection B awaits removal
9-21-08Apr 22, 2009
|
|

Up the Drive38 viewsThe remote trax hauls the section up the drive
9-21-08Apr 22, 2009
|
|