Delivery |
 |
| TITLE |
+ |
- |
| FILE NAME |
+ |
- |
| DATE |
+ |
- |
| POSITION |
+ |
- |
|
|

Tag Unit and Remote Trax47 viewsThe tag unit being moved with the remote trax
1-25-08
|
|

Moving the Tag into position54 viewsThe tag unit is being moved toward the slab
1-25-08
|
|

The Tag Unit50 viewsThe side of the tag unit that connects to the main house. Note the stud spacing.
1-25-08
|
|

Tag Unit49 viewsThe west side of the tag unit
1-25-08
|
|

The Second Section Arrives45 viewsThe second section is coming down the road
1-25-08
|
|

Waiting for the main sections53 viewsThe slab looks a bit empty
1-25-08
|
|

The Second Section Starting the Turn44 viewsThe second section begins the tight turn onto the driveway
1-25-08
|
|

The Second Section56 viewsTraveling down the driveway
1-25-08
|
|

Backing in55 viewsThe second section backs into position
1-25-08
|
|

The Second Section Almost Placed61 viewsThe second section approaches the slab
1-25-08
|
|

Tight Turn70 viewsThe last section makes the tight turn from the roadway.
1-25-08
|
|

Made the Turn66 viewsThe last section completes the tight turn
1-25-08
|
|
| 23 files on 2 page(s) |
 |
1 |  |
|